Construction Trade Research Area HOME Page How to Prepare for Your Exam Exam Preparation Products Our Refund Policy Contact Us Frequently Asked Questions

New Mexico
(GF-4) Drainage or Flood Control Systems

Apply for the License

Construction Industries Division
Regulation and Licensing Department
2550 Cerrillos Road
Santa Fe, NM 87505
(505) 476-4700
www.rld.state.nm.us/CID

Exam Administrator

PSI Licensure : Certification
3210 E. Tropicana
Las Vegas, NV 89121
Phone: (800) 733-9267
Candidate Information Web Page

Exam Type
OPEN  BOOK
Exam Content
Subject Area # of Questions
Earthwork 9
Culverts and Pipe 9
Concrete 9
Project Management 3

Total Number of Test Questions: 30
Time Allowed (minutes) 75
Passing percentage 75%

In New Mexico you must also pass a Business and Law Exam unless you are already a licensed contractor who is adding a classification to your license.

25% Discount Notice

Recommended (permitted) Reference Books
1. Design and Construction of Urban Stormwater Management Systems, 1992, American Society of Civil Engineers.
2. New Mexico Interim Specifications for Highway and Bridge Construction, 2005, NMDOT (file size 4.65mb). Doc Link
3. Installation Guide for Ductile Iron Pipe, 2000, Ductile Iron Pipe Research Association.

Our Study SystemHow We Write Our Questions

Recommended Study Materials
New Mexico • GF-4
Drainage or Flood Control Systems
Product Name Price Description  
EEQ Software Logo
EEQ Learner Software for Windows

price

About Software

Quantity:

Return to the New Mexico Home Page

View Copyright Law

 15-Aug-2007

Return to Top