Content Areas | # of Questions |
---|---|
Utilities Layout, Excavation & Compaction (Backfilling) | 12 |
Water Piping Systems | 8 |
Sewer & Storm Water Systems | 6 |
Septic Systems | 4 |
Gas Piping Systems | 4 |
Paving | 2 |
Safety – OSHA | 4 |
Construct concrete and masonry sewers, packaged sewer disposal plants, sewage lift stations, septic tanks, and appurtenancesthereto; to lay all types of piping for storm drains, water, and gas lines, irrigation and sewers, manholes in connection with the abovework; and repairing and reconditioning of the pipelines, including the excavation, grading, trenching, backfilling, paving, and surfacing inconnection therewith.
The state of Hawaii requires that you take and pass a written Business and Law Exam exam for this trade.
Sample questions are based on the PSI publication titled “29 CFR PART 1926 Selections, as of June 2013” (highlighted in green above).
This file contains approx. 800 sample questions.
REMINDER: PSI uses this book for many exams they offer. Not all sections of this code will apply to your exam.
We also include a table showing the relationship between our questions and OSHA code sections. Corrections to the original PSI publication are noted. The index/table is available for veiwing before you purchnse from the button above.